1st Pic - Is the floor with no waves in it....the mission turned out possible!
2nd Pic - Side tables and sit/Stand desk is back in place
3rd Pic - An example of how handy the earlier linked Rope Cams are. The Step revolution bracket was sprung, so I was able to plumb them sides before drilling the door jam.
4th Pic - Step Revolution installed...NO MORE LADDER to get in....
Tomorrow, I am placing the island base. I am going to play with whether I can move it enough, so I can access the freezer door with the slides in. Another excellent opportunity to mess something up..LOL
2nd Pic - Side tables and sit/Stand desk is back in place
3rd Pic - An example of how handy the earlier linked Rope Cams are. The Step revolution bracket was sprung, so I was able to plumb them sides before drilling the door jam.
4th Pic - Step Revolution installed...NO MORE LADDER to get in....
Tomorrow, I am placing the island base. I am going to play with whether I can move it enough, so I can access the freezer door with the slides in. Another excellent opportunity to mess something up..LOL
