• Click here to access some of the presentations made during the 2022 National Rally

Re-Installing OEM steps

KevIke

New member
We have a 2021 310RL. It has been stationary at an RV resort for a few years and the fold up steps were removed and replaced with a wood deck / steps.
What size and type of screws should I use to reattach the fold up steps?
TIA
 

George

Prominent Member
I didn't measure but it it looks like #14 x 1½", maybe 1¼"
Since the holes are already there you don't really need self-drilling/drill-point

IMG_2071.jpeg
 

Flyer32RLS

Well-known member
We have a 2021 310RL. It has been stationary at an RV resort for a few years and the fold up steps were removed and replaced with a wood deck / steps.
What size and type of screws should I use to reattach the fold up steps?
TIA
If you are putting the steps back in, check out the steps with strutt assist. Very light to lift and pull down. I got rid of my factory installed steps with a month of getting our 32RLS. Love the steps!! E-Trailer. Just measure the door as they so to on their web page.
 

Jwtsg

Well-known member
Put a little larger screw back in the already drilled hole. Make sure the screw gets a good bite on floor board.
there is some pressure on those stairs Going up and down, don’t want them pulling loose!

ROLL ON!
Agreed & recommend hand tightened rather than screw gun so they don’t strip out unintentionally!
 
Top